User's Manual

12
3.3. Hardware Installation
CAUTION: Before servicing, make sure the AC power has been disconnected, and
the battery switch has been slid to OFF position.
Step 1. For configuration and operation of the Control Panel via Ethernet, connect an
Ethernet cable to RJ-45 port.
Step 2. (Optional) Insert a Micro-SIM card with the gold (metal) side facing down, as
example shown below. Before inserting the SIM card, please make sure the pin
code is deactivated and SMS messages are removed first.
<NOTE>
Before inserting the SIM Card, please power off the panel.
Please make sure to insert a SIM card with data plan.
After inserting the SIM Card, please power on again.
Step 3. Complete wiring for Zone 1-16 terminals, GND terminals, AUX power terminals, PGM
terminals, Bell terminals, and Keypad terminals. (Please see the following sections for
details.)
Step 4. Connect the battery pack to the PCB board.
Step 5. Connect to the mains power using the built-in power unit.
Step 6. (Optional, for SLA battery) Take out the in-line tube fuse holder from the package.
Place the tube fuse inside the holder and screw it.
Step 7. (Optional, for SLA battery) Attach the black cable from Hybrid Panel board to the SLA
battery terminal (the negative polarity). Attach the red cable from Hybrid Panel board
to the SLA battery red connector (the positive polarity).
Step 8. Slide the battery switch to ON position.