Technical data

17 Manual #001449 Version 4.2
Maintenance Schedule
Due to the unique design features of your new "RE-COIL-AWAY", the need for continual mainte-
nance normally associated with conventional door systems (i.e.: guide rollers, hinges, door track,
etc.) is virtually eliminated. The limited maintenance procedures listed below, when completed as
indicated, will assure many years of trouble-free operation.
MAINTENANCE
PROCEDURE
INITIAL
1,500 CY-
CLES
EVERY 25,000
CYCLES OR 3
MONTHS
EVERY 100,000 CYCLES
OR 12 MONTHS
LUBRICATE:
Flange Bearing (4)
Drive Chain
NO
NO
NO
OIL
Grease, 1 shot
OIL
ADJUSTMENTS:
(check & adjust if neces-
sary)
Drive Chain Tension
Guides, bottom bar &
header assembly for
rust or damage
Guide Opening 1/2"
All Fasteners (check
for tightness)
Limit Settings
Reversing Edge
(check for proper op-
eration and any signs
of damage)
YES
YES
NO
YES
YES
YES
YES
YES
YES
YES
YES
EVERY MONTH
YES
YES
YES
YES
YES
YES