User Manual
72/302 Issue 01 - April 2001 - Draft 04 3CC12424AAAA TQ BJA 01
76
Figure 52 – DBS fiber optic winding cassettes
Stages
1. According to the site configuration, prepare the connection cables and fit them with the required
connectors.
Figure 53 – Fiber optic cables wiring
2. Connect the fiber optic jumpers (see Figure 51 – Fiber optic cables connection and Figure 53 – Fiber
optic cables wiring) and the main cables.
DO NOT SET THE FIBER OPTIC IN FRONT OF THE VENTILATION PLUG-IN UNIT:
SET IT AS SHOWN IN FIGURE 50.
Winding cassettes