User Manual

72/302 Issue 01 - April 2001 - Draft 04 3CC12424AAAA TQ BJA 01
76
Figure 52 DBS fiber optic winding cassettes
Stages
1. According to the site configuration, prepare the connection cables and fit them with the required
connectors.
Figure 53 Fiber optic cables wiring
2. Connect the fiber optic jumpers (see Figure 51 Fiber optic cables connection and Figure 53 Fiber
optic cables wiring) and the main cables.
DO NOT SET THE FIBER OPTIC IN FRONT OF THE VENTILATION PLUG-IN UNIT:
SET IT AS SHOWN IN FIGURE 50.
Winding cassettes