User's Manual
236/346 Issue 01 - April 2001 - Draft 04 3CC12426AAAA TQ BJA 01
242
Main steps
To commission a Base Station it is necessary to carry out the following:
– installation of the DBS rack (see Chapter 3.5 – Base Station equipment installation),
– installation and configuration of the associated X-Pol RBS(s) (see Chapter 3 – Installation of the
Base Station),
– configuration and commissioning of the station using the 7390LT.
5.1.1 – Equipment required
To configure the Base Station parameters the following equipment is required:
–the X-Pol RBS transceivers already installed outdoors, connected to the DBS,
– ARESTOR,
– SPLITTER,
– BIAS-T,
– RS422,
–IGAU,
–the DBS rack assembly,
– a laptop PC equipped with:
• the 7390LT Base Station initialisation and programming software, (see Appendix 2 – Installa-
tion of 7390LT software),
• the Windows
â
NT4 SP5 Workstation
â
system,
• the data transfer application (OMNI
â
NFS).
The minimum PC specifications are as follows:
– microprocessor: Pentium II 450 MHz,
– RAM: 128 MB,
– Hard disk: min. 10 GB,
– Graphics board: 8 MB,
– 3" 1/2 floppy drive (internal or external),
– 12x CD drive (internal or external),
– ports: 1 available serial (DB9) and 1 available parallel (centronix) port,
– mouse: 2 buttons (PS2 series) or tracking device,
– network board: Ethernet 10/100BT (RJ45),
– 12" monitor (1024x768).