User's Manual

236/346 Issue 01 - April 2001 - Draft 04 3CC12426AAAA TQ BJA 01
242
Main steps
To commission a Base Station it is necessary to carry out the following:
installation of the DBS rack (see Chapter 3.5 – Base Station equipment installation),
installation and configuration of the associated X-Pol RBS(s) (see Chapter 3 – Installation of the
Base Station),
configuration and commissioning of the station using the 7390LT.
5.1.1 Equipment required
To configure the Base Station parameters the following equipment is required:
–the X-Pol RBS transceivers already installed outdoors, connected to the DBS,
ARESTOR,
SPLITTER,
BIAS-T,
RS422,
–IGAU,
–the DBS rack assembly,
a laptop PC equipped with:
the 7390LT Base Station initialisation and programming software, (see Appendix 2 – Installa-
tion of 7390LT software),
the Windows
â
NT4 SP5 Workstation
â
system,
the data transfer application (OMNI
â
NFS).
The minimum PC specifications are as follows:
microprocessor: Pentium II 450 MHz,
RAM: 128 MB,
Hard disk: min. 10 GB,
Graphics board: 8 MB,
3" 1/2 floppy drive (internal or external),
12x CD drive (internal or external),
ports: 1 available serial (DB9) and 1 available parallel (centronix) port,
mouse: 2 buttons (PS2 series) or tracking device,
network board: Ethernet 10/100BT (RJ45),
12" monitor (1024x768).