User's Manual

Initial start-up and system test
Important! The procedures for initial start-up and test are not covered in t his
document. Refer to Integration Engineering Handbook, IEH 401.
Before initial start-up and test
To perform initial start-up and system test, the RF jumper cables will be temporarily
disconnected at the eNodeB by the personnel who perform initial start-up and system test.
After performing initial start-up and system test, the personnel will permanently connect
the RF jumper cables to the eNodeB.
After initial start-up and test
NOTICE
RF hazard!
If it is necessary to disconnect an RF jumper cable, make sure there is no t ransmit signal
in the RF jumper cable.
...................................................................................................................................................................................................
1
Once initial start-up and test have been completed, make sure the RF jumper cables are
properly connected to the radio cabinet. Refer to Connect RF jumper cables t o eNodeB on
page 7-9.
...................................................................................................................................................................................................
2
Important! Hold the body of the 90 degree connector (part connected to the entry
cable) with a 22 mm open-end wrench. Torque the rotating nut with a 32 mm
open-end wrench.
Torque each RF connector at the radio cabinet to 25 Nm (221 in-lb).
...................................................................................................................................................................................................
3
Finally, secure the RF jumper cables along their route.
Finish the installation
Final connections
Initial start-up and system test
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
9412 eNB Compact
418-000-415
Issue 4.1 August 2011
Alcatel-Lucent Internal
Proprietary Use pursuant to Company instruction
7-15
E ND OF STEPS
...................................................................................................................................................................................................