User's Manual

Item # Description Yes (Y) No (N) N/A Comments
10. Are all ground connections in compliance
with Alcatel-Lucent requirements
(exothermic weld, compression type with
2-hole lugs; properly secured; antioxidant
used on contact surface area) ?
Y N N/A
11. Are all grounding conductors routed as
straight as possible with no loops or sharp
bends?
Y N N/A
12. Is cabinet support structure grounded? Y N N/A
13. Are metallic conduits bonded at both ends
and 7.62 meter (25 foot) intervals?
Y N N/A
14. Are all fence corner posts and gate posts
properly grounded (including fence fabric
and barbed wire, as applicable) ?
Y N N/A
15. Are all metallic objects in the vicinity
bonded to the grounding system?
Y N N/A
16. Is AC power supply equipped with a surge
protection device and is the device
properly connected to the ground system?
Y N N/A
17. Is T1/E1 line equipped with a surge
protection device and is the device
properly connected to the ground system?
Y N N/A
18. Is tower light system (if installed)
equipped with a surge protection device
and is the device properly connected to the
ground system?
Y N N/A
19. Are the GPS antenna cable shields
properly grounded? Is surge protection in
place and properly grounded GPS
antenna?
Y N N/A
21. Is supplementary conductor connected to
grounding electrode system? (Exposed
end, if any, must be taped.)
Y N N/A
9927 Distributed Base Station Outdoor Cabinet site
preparation checklists
SP-3 Site preparation grounding checklist
....................................................................................................................................................................................................................................
....................................................................................................................................................................................................................................
9927 Dist BTS Outdoor
401-703-516
Issue 1 March 2012
Alcatel-Lucent Proprietary
Use pursuant to applicable agreements
A-7