User's Manual

Lucent Technologies Proprietary
See notice on first page
17-2
401-660-100 Issue 11 August 2000
Corrective Maintenance using ECP Craft Interface
Swapping CDMA Spectrum to/from
AMPS/TDMA 17-14
Procedure to Swap CDMA Spectrum to/from AMPS/TDMA 17-14
Generating Status Reports of Spectrum Swap of CDMA
to/from AMPS/TDMA 17-15
Procedure to Generate Spectrum Swap Status Reports 17-15
Running Cell Site Audits 17-16
Procedure to Audit Cell Sites 17-16
Diagnosing Cell Site Data Links 17-17
Procedure to Diagnose Cell Site Data Links 17-17
Stopping Cell Site Data Link Diagnostics 17-19
Procedure to Stop Cell Site Data Link Diagnostics 17-19
Diagnosing Cell Site Trunks Associated with a Server Group
and Antenna Face (Non-CDMA) 17-20
Procedure to Diagnose a Cell Site Trunk Server Group and
Antenna Face 17-20
Stopping Diagnostics on Cell Site Trunks Associated with
a Server Group and Antenna Face 17-21
Procedure to Stop Diagnostics on a Cell Site Trunk Server
Group and Antenna Face 17-21
Requesting Cell Site Data Link NVM Updates 17-22
Procedure to Update Cell Site NVM 17-22
Requesting Cell Site Hardware Unit NVM Updates 17-23
Procedure to Request Cell Cite Hardware Unit NVM
Updates 17-23
Initializing Cell Sites 17-24
Procedure to Initialize Cell Sites 17-24
Initializing, Setting Up, and Using OCNS at CDMA Cell Sites 17-26
Procedure to Initialize, Set Up, or Use OCNS at a CDMA
Cell Site 17-27
Expansion of Maintenance Request Administrator (MRA) and
Technician Interface Information Fields (MRAINFO/TIINFO),
Feature IDentification (FID) #3461.0 17-28
Lucents Maintenance Strategy 17-28
The Maintenance request Administrator Info (MRAINFO) &
Technician Interface Info (TIINFO) Fields 17-29
Increased Length and Values Supported by MRAINFO and
TIINFO Fields 17-29