User's Manual

xxv
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
PERFORM THE NEXT TWO STEPS ONLY IF INSTALLING A PRIMARY CABINET
Move/lift the primary cabinet into position 2 - 31
Install anchoring bolts or anchor assemblies and level the primary cabinet 2 - 32
PERFORM THE NEXT SEVEN STEPS ONLY IF INSTALLING A WNG24-BC BATTERY CABINET
Prepare the existing cabinet for attachment of an additional cabinet 2 - 35
Prepare the cabinet being installed for attachment to the existing cabinet 2 - 37
Partially install the AC cable guide in the cabinet being installed 2 - 39
Move/lift the cabinet being installed into position 2 - 40
Attach the cabinets together at the square cable support (with second battery
cabinet only)
2 - 42
Install anchoring bolts or anchor assemblies and level the battery cabinet(s) 2 - 45
Complete the installation of the AC feed-through coupling and tighten the
anchor bolts or nuts
2 - 48
PERFORM THE NEXT SEVEN STEPS ONLY IF INSTALLING A 4.0B DUAL BAND CABINET
Prepare the previous Modular Cell cabinet for connection of a 4.0B dual band
cabinet
2 - 51
Partially install the AC cable guide in the previous Modular Cell cabinet, if
applicable
2 - 53
Prepare the 4.0B dual band cabinet for connection to the previous Modular Cell
cabinet
2 - 54
Position the 4.0B dual band Modular Cell cabinet 2 - 56
Install anchoring bolts or anchor assemblies and level the 4.0B dual band
cabinet
2 - 58
Finish the installation of the AC cable guide and tighten the anchor bolts 2 - 60
Attach the 4.0B dual band Modular Cell cabinet to the previous Modular Cell
cabinet at the RF cable guide
2 - 62
PERFORM THE NEXT FIVE STEPS FOR ALL CABINETS, IF APPLICABLE
Install the cabinet grounding cables 2 - 65
Remove the lifting eye bolts 2 - 67
Install the top solar shield 2 - 70
Install the right side solar shield on the primary cabinet (reference, if applicable) 2 - 75
Adjust the door roller bearing (if required) 2 - 76
COMPLETED INSTALLATION STEP PAGE