User's Manual

xxvi
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
.............................................................................................................................................................................................................................................................
Chapter 3: Cable connections in the Modular Cell 4.0B cabinets
Overview
Table 2 lists the procedures covered in Chapter 3 for cable connections
in the 4.0B Modular Cell primary and dual band cabinets.
Modular Cell 4.0B Primary Cabinet Serial Number:
_______________________________
Modular Cell 4.0B Dual Band Cabinet Serial Number:
_______________________________
Table 2
Chapter 3
COMPLETED INSTALLATION STEP PAGE
PERFORM THE NEXT THREE STEPS IF INSTALLING A 4.0B PRIMARY CABINET, IF APPLICABLE
Connect the unterminated end of the GPS jumper cables to the Modular Cell
4.0B primary cabinet, if applicable
3 - 4
Connect a terminated end of the GPS antenna jumper cables to the Modular
Cell 4.0B primary cabinet, if applicable
3 - 8
Connect the GPS antenna jumper cable to the GPS surge protector at the GPS
antenna cable
3 - 11
PERFORM THE NEXT STEP TO INSTALL THE CONDUITS FOR TI/E! LINES AND EXTERNAL USER ALARMS
Connect the conduit between the metal conduits and the antenna cable cover
of the 4.0B primary cabinet
3 - 13
PERFORM THE NEXT STEP IF INSTALLING A DUAL BAND CABINET IN AN INTEGRATED POWER LINE-UP
Route T1/E1 cables to the Modular Cell 4.0B dual band cabinet 3 - 16
PERFORM THE NEXT STEP IF INSTALLING A DUAL BAND CABINET IN A LINE-UP WITH A POWERHOUSE 24 CABINET
Route the T1/E1 cable(s) to the Modular Cell 4.0B dual band cabinet (in line-
ups that utilize existing PowerHouse24 or customer supplied power)
3 - 19
PERFORM THE NEXT STEP IF INSTALLING A DUAL BAND CABINET IN A LINE-UP WITH A WNG POWER CABINET
Route the T1/E1 cable(s) to the Modular Cell 4.0B dual band cabinet (in
installations that utilize an existing WNG power cabinet)
3 - 24
PERFORM THE NEXT TWO STEPS IF INSTALLING T1/E1 AND/OR USER ALARM CABLES
Install the EMI / RFI cord grip seals with T1/E1 and user alarm cables 3 - 29
Prepare the T1/E1 and user alarm cables for punchdown and ground
connection at the facilities interface module
3 - 33