User's Manual

xxxiii
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
Chapter 6: RF cable connections between existing Modular Cell
.............................................................................................................................................................................................................................................................
cabinets and a Modular Cell 4.0B dual band cabinet
Overview
Table 5 lists the procedures covered in Chapter 6 for connection of
cables between Modular Cell 4.0B dual band cabinets and the existing
cabinet(s) in a line-up.
Modular Cell 4.0B Dual Band Cabinet Serial Number:
_______________________________
Table 5
Chapter 6
COMPLETED INSTALLATION PROCEDURE PAGE
PERFORM THE NEXT THREE PROCEDURES BEFORE STARTING THE INSTALLATION OF CABLES BETWEEN MODULAR CELL
CABINETS
Read cabinet definitions 6 - 3
Identify your line-up configuration 6 - 4
Determine the prerequisite changes needed in the existing cabinet(s) in your
line-up configuration
6 - 5
PERFORM THE A NEXT TWO PROCEDURES TO ROUTE AND CONNECT RF CABLES BETWEEN MODULAR CELL CABINETS
Route and connect the 15-MHz cable(s) 6 - 9
Route and connect the GPS cable 6 - 18