User's Manual

xxxiv
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
.............................................................................................................................................................................................................................................................
Chapter 7: Finishing the installation
Overview
Table 6 lists the procedures covered in Chapter 7 for finishing the
installation of the Modular Cell 4.0B primary cabinet and dual band
cabinets, as well as the WNG24-BC battery cabinets.
Modular Cell 4.0B Primary Cabinet Serial Number:
_______________________________
Modular Cell 4.0B Dual Band Cabinet Serial Number:
_______________________________
WNG24-BC Battery Cabinet Serial Number:
_______________________________
Table 6
Chapter 7
COMPLETED INSTALLATION STEP PAGE
PERFORM THE NEXT THREE STEPS TO VERIFY ANTENNA STATUS AND REFERENCE POWER UP AND SYSTEM TESTS
Verify GPS antenna connection 7 - 3
Verify RF antennas not connected 7 - 3
Perform power-up and system test 7 - 4
PERFORM THE NEXT FIVE STEPS IF INSTALLING A 4.0B PRIMARY OR DUAL BAND CABINET
Test and connect the internal battery cables (if applicable) 7 - 5
Connect the unterminated end of the RF antenna jumper cables to the Modular
Cell 4.0B primary or 4.0B dual band cabinet
7 - 8
Connect a terminated end of the outdoor RF antenna jumper cables to the
Modular Cell 4.0B primary or 4.0B dual band cabinet
7 - 12
Connect RF antenna jumper cables to the antenna cables 7 - 15
Replace / close all access panels and doors 7 - 18
PERFORM THE NEXT STEP IF INSTALLING A FIRST OR SECOND BATTERY CABINET
Finish the installation of the first or second WNG24-BC battery cabinet 7 - 19