User's Manual

xxxvii
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
PERFORM THE NEXT SIX STEPS TO ROUTE AND CONNECT THE FIRST BATTERY BASE MODULE CABLES IN THE MODULAR
CELL 4.0B CABINET
Identify the individual cable connectors and their terminations on each end A - 66
Identify the HPDA in the 4.0B Modular Cell cabinet A - 67
Route and connect the fuse alarm and fan power/alarm cables in the Modular
Cell 4.0B cabinet
A - 69
Route and connect the intrusion alarm cable in the Modular Cell 4.0B cabinet A - 71
Route and connect the thermal probe cable in the Modular Cell 4.0B cabinet A - 73
Connect the heater pad kit AC cable in the Modular Cell cabinet A - 74
PERFORM THE NEXT FOUR STEPS TO PHYSICALLY ATTACH, PREWIRE, AND GROUND AN ADD-ON BATTERY MODULE
Attach an add-on module to an existing battery module and attach the internal
ground cable
A - 80
Install the heater pads and outer frame wiring (Reference) A - 81
Install the battery module outer frame over the inner frame and attach the
internal ground cables
A - 82
Attach the internal ground cable between the add-on module and the module
below it
A - 83
PERFORM THE NEXT STEP TO ROUTE AND CONNECT THE AC CABLE FROM AN ADD-ON BATTERY MODULE TO THE MODULE
BELOW IT
Route and connect the AC cable from the add-on module to the next lower
module
A - 84
PERFORM THE NEXT TWO STEPS TO INSTALL THE INTRUSION ALARM AND THERMAL PROBE CABLES IN AN ADD-ON MODULE
Route and connect the intrusion alarm cable from the existing battery module
and connect it in the add-on module being installed
A - 87
Move the thermal probe from the existing battery module and mount it in the
add-on module being installed
A - 92
PERFORM THE NEXT TWO STEPS TO INSTALL THE DC CABLES FROM AN ADD-ON BATTERY MODULE TO THE MODULE BELOW
IT
Identify the module to module DC cables and wiring A - 94
Route and connect the two +24V DC load and two 24V Return cables from the
add-on module to the battery module below it
A - 96
PERFORM THE NEXT STEP TO PLACE, ANCHOR, AND PREWIRE THE SECOND BATTERY BASE MODULE
Place, anchor and prewire the second battery base module (Reference) A - 104
COMPLETED INSTALLATION STEP PAGE