User's Manual

xl
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Installation process
Appendix B: Non-Lucent power ancillary hardware installation, cable
.............................................................................................................................................................................................................................................................
routing and connection
Overview
Table 8 lists the procedures covered in Appendix B for Non-Lucent
power ancillary hardware installation, cable routing and connection to
Modular Cell 4.0B primary and dual band cabinets.
Modular Cell 4.0B Primary Cabinet Serial Number:
_______________________________
Modular Cell 4.0B Dual Band Cabinet Serial Number:
_______________________________
Table 8
Appendix B
COMPLETED INSTALLATION STEP PAGE
PERFORM THE NEXT FOUR STEPS TO INSTALL THE ANCILLIARY HARDWARE AND PHYSICALLY ATTACH THE NON LUCENT
POWER SOURCE
Install the cable duct assembly B - 4
Install the AC conduit B - 6
Attach the non-Lucent power source directly to the cable duct (zero spacing), if
applicable
B - 11
Attach the non-Lucent power source to the cable duct assembly using conduits. B - 14
PERFORM THE NEXT TWO STEPS TO ROUTE AND CONNECT THE DC CABLES BETWEEN THE NON-LUCENT POWER SOURCE
AND THE MODULAR CELL 4.0B PRIMARY CABINET
Route the DC cables from the Modular Cell 4.0B primary cabinet to the non-
Lucent power source
B - 22
Connect the DC cables at the Modular Cell 4.0B primary cabinet B - 24
PERFORM THE NEXT FOUR STEPS TO ROUTE AND CONNECT THE POWER ALARM CABLE BETWEEN THE NON-LUCENT POWER
SOURCE AND THE MODULAR CELL 4.0B PRIMARY CABINET
Route the power source alarm cable to the Modular Cell 4.0B primary cabinet B - 27
Install the EMI / RFI cord grip seal with the alarm cable B - 32
Prepare the alarm cable for punchdown and ground connection at the facilities
interface panel
B - 35
Connect alarm cable to the EFIM punchdowns in Modular Cell 4.0B cabinet B - 37
PERFORM THE NEXT THREE STEPS TO ROUTE AND CONNECT THE AC CABLE(S) BETWEEN THE NON-LUCENT POWER
SOURCE AND THE MODULAR CELL 4.0B PRIMARY CABINET
Route the AC power cables to the Modular Cell 4.0B primary cabinet B - 42