User's Manual

Overview of the Flexent‚ Modular Cell 4.0B cabinet
installation
1- 19
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
4.0B dual band cabinets in
legacy line-ups with
integrated power
The following diagram shows configuration options for 4.0B dual band
cabinets in legacy line-ups with integrated power.
Refer to Chapter 2,
Heat exchanger and solar shield configurations for
Modular Cell 4.0B cabinets on Page 2 - 69 for heat exchanger and solar
shield applications for the following configurations
FRONT HEAT
EXCHANGER
1-6C
4.0
850
P
B
1-2C
4.0
850
P
EZBFo
BATTERY
1and2
P
B*
1-11C
4.0B
PCS
1-11 PCS CARRIERS
7-8 850 CARRIERS
(in G-1 with 6C Primary)
FRAME
1-3C
3.0
850
P
B
1-3C
3.0
850
P
B
EZBFo
BATTERY
1and2
P
B*
1-11C
4.0B
PCS
1-11 PCS CARRIERS
8 850 CARRIERS
,G-1(3.0 Primary
(4.0B Dual Band)
*
FRAME
P
B
1-2C
4.0
850
(4.0B Dual Band)
*
AND 4.0 G-2)
1-4C
4.0
850
P
B
1-4C
4.0
850
P
B
EZBFo
BATTERY
1and2
P
B*
1-11C
4.0B
PCS
1-11 PCS CARRIERS
5-8 850 CARRIERS
(in G-1 with 4C Primary)
FRAME
(4.0B Dual Band)
*
**
**
66ECv2 battery cabinets may also have been used to support the existing legacy
cabinets in these configurations
* 850 cabinets have batteries; PCS cabinets above 8 carriers will not have
batteries because of the presence of the A6 amplifier shelf.
EZBFo BATT
FRAME or
WNG BATT
CABINET 1
EZBFo BATT
FRAME or
WNG BATT
CABINET 2
EZBFo BATT
FRAME or
WNG BATT
CABINET 1
EZBFo BATT
FRAME or
WNG BATT
CABINET 2
EZBFo BATT
FRAME or
WNG BATT
CABINET
1/2