User's Manual

Power and power alarm connections in Modular Cell 4.0B
cabinets with integrated power
4- 3
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
Power and alarm wiring overview
..............................................................................................................................................................................................................................................................................
Overview
Purpose
The purpose of the section is to provide illustrations of the cables routed and
connected in this chapter. Instructions are provided for AC wire routing to 4.0B
primary and dual band cabinets.
AC conduits
A junction box installed near the primary / dual band line-up will provide
individual feeds to both the primary and dual band cabinet, while requiring
only one feed from the main panel. Refer to the figure below and the figure on
Page 4 - 4.
J
unc
ti
on
b
ox
for AC power to
4.0B dual band
cabinet
2” conduit assembly
for AC power to
4.0B dual band
cabinet
CABINET
1
CABINET
2
EXAMPLE 1:
CABINET 1 = 850 Primary
CABINET 2 = PCS Dual Band
EXAMPLE 2:
CABINET 1 = PCS Primary
CABINET 2 = 850 Dual Band
2” conduit assembly for
AC power (TYP) in lower
position
2” conduit assembly for
T1/E1 and User Alarms
(TYP) in upperposition
914.4 (36.0) Min.
for service access
900.3 (35.44) Min.
for service access
813
(32.0)
1016
(72.0)