User's Manual

4-4
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Power and power alarm connections in Modular Cell 4.0B
cabinets with integrated power
Power and alarm wiring for
integrated power 4.0B
primary and dual band
cabinets with battery
cabinets and frames
This module provides a key list and an illustration of the AC utility
connections, as well as the internal AC and DC power and power alarm
wiring at a Modular Cell 4.0B site that has examples of both WNG
battery cabinets and EZBFo battery frames. WNG battery cabinets
support 4.0B primary cabinets only. Refer to the key and figure below.
1. AC utility connection to the primary cabinet
2. First WNG battery cabinet (a second battery cabinet can be
connected)
3. AC, DC, alarm and fan power / alarm cable connections from the
first battery cabinet to the primary cabinet
4. RF connections between the primary cabinet and growth/DB*
cabinet (refer to Chapter 6)
5. AC utility connection to the dual band cabinet (via a junction box)
6. EZBFo battery frame (a second battery frame can be connected).
Refer to Appendix A for installation instructions.
7. AC, DC, alarm and fan power / alarm cable connections from the
first battery frame to the dual band cabinet
MODULAR
CELL 4.0B
PRIMARY CABINET
FIRST
WNG24-BC
BATTERY CABINET
MODULAR
CELL 4.0B
DUAL BAND CABINET
SECOND
WNG24-BC
BATTERY
CABINET
3
6
1
AC
AC
DC
4
REAR VIEW
ALARMS AND
FAN POWER/
ALARM.
5
ADD-ON
BATTERY
MODULE #2 *
(3rd Module)
ADD-ON
BATTERY
MODULE #1
(2nd Module)
EZBFo BATTERY
FRAME #1
(REFER TO
APPENDIX A)
BATTERY
BASE
MODULE #1
DC,
ALARMS,
AND FAN
POWER/
ALARM.
7
2
* If installed in seismic zone 4, a second add-on module requires a Zone 4 kit for installation
AC