User's Manual

Power and power alarm connections in Modular Cell 4.0B
cabinets with integrated power
4- 5
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
.............................................................................................................................................................................................................................................................
Safety precautions
The following safety precautions should be read and understood before
starting the installation of power cables.
CAUTION
Damage to equipment
The battery cables in the primary cabinet must not be
connected until after the AC utility wires are connected and
AC power is turned on at the main panel. Do not connect the
battery cables until instructed to do so in Chapter 7,
"Finishing the installation."
WARNING
Electrical Shock Hazard
Failure to follow the order of the installation procedure (as
written) can result in an energized AC or DC circuit, which
creates an electrical shock hazard.
Follow these rules:
1. Do not connect AC power until instructed to do so.
2. When making AC connections at the primary or dual
band cabinets, make sure that AC power is turned off at
the main panel.
3. When installing battery cabinets, do not connect any
DC cables, until instructed to do so.
4. Observe and strictly follow all additional safety
precautions.
5. When completing electrical connections, always use
tools that are properly insulated.
6. Depending upon local regulations, AC utility power
connections to the Modular Cell 4.0B primary and dual
band cabinet may be performed by a licensed
electrician.