User's Manual

4-6
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Power and power alarm connections in Modular Cell 4.0B
cabinets with integrated power
How to route and connect the AC
utility wires at a Modular Cell 4.0B
primary or dual band cabinet
.............................................................................................................................................................................................................................................................
Overview
Purpose
This section contains instructions for routing and connection of the AC
utility wires at a Modular Cell 4.0B primary or dual band cabinet.
.............................................................................................................................................................................................................................................................
Route and connect the AC utility wires
Overview
This section contains the following procedures.
Prepare the AC power module (ACPDA) for connection of the
AC utility wires
4 - 7
Install a 2-inch flexible conduit fitting on the primary or dual
band cabinet
4 - 9
Connect the flexible conduit between the existing metal
conduit and the fitting at the primary or dual band cabinet
4 - 10
Route and connect the AC utility wires in the primary or dual
band cabinet
4 - 12