User's Manual

Cable connections in the Modular Cell 4.0B cabinets
3- 35
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
Connection of T1/E1 Lines to the EFIM punchdowns in Modular Cell
.............................................................................................................................................................................................................................................................
4.0B cabinets
Overview
This procedure module provides instructions for connecting of the T1/
E1 cables in a Modular Cell 4.0B primary or 4.0B dual band cabinet
T1/E1 installation will vary depending upon the Universal Radio
Controller (URC or URCII) in use in the cabinet being installed. A
URC accepts a maximum of twelve TI/E1 lines (one cable). A URCII
accepts a maximum of twenty TI/E1 lines (two cables).
Instructions are provided for 4.0B cabinets that have a maximum of
twelve T1/E1 lines, as well as for 4.0B cabinets that have a maximum
of twenty T1/E1 lines. 4.0B cabinets that have a maximum of twenty
T1/E1 lines have a different EFIM (POD B has been added) for internal
punch down of T1/E1 and user alarm cables.
Punch down T1/E1 lines on the EFIM in Modular Cell 4.0B
cabinets that accept a maximum of twelve T1/E1 lines
3 - 36
Punch down T1/E1 lines on the EFIM in Modular Cell 4.0B
cabinets that accept a maximum of twenty T1/E1 lines
3 - 41