Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
Finish the installation of
the AC cable guide and
tighten the anchor bolts
Important! If the 4.0B dual band cabinet being installed is
equipped with integrated power, skip to Attach the 4.0B dual band
Modular Cell cabinet to the previous Modular Cell cabinet at the RF
cable guide on Page 2 - 62
Perform the following steps to finish the installation of the AC cable
guide between the 4.0B dual band cabinet and the previous cabinet and
tighten the anchor bolts. Do not perform these steps if the 4.0B dual
band cabinet being installed is equipped with integrated power
Important! When performing the next step, do not disfigure
the sealing washer in any way. Otherwise, the watertight seal will
be lost (at a point near the bottom of the cabinet).
................................................................................................................................
............................................
1 Remove the temporary locknut from the AC coupling inside of the 4.0B
dual band cabinet and fully install a sealing washer (“BOX SIDE”
facing the cabinet wall) on one end of the 2-inch feed-through coupling.
Refer to the figure on Page 2-61.
................................................................................................................................
............................................
2 Replace and hand-tighten the locknut and install a 2-inch plastic bushing
on the end of the coupling.
................................................................................................................................
............................................
3 Tighten the locknut inside of the 4.0B dual band cabinet and install a 2-
inch plastic bushing on the end of the coupling.
Important! When performing the next step, do not seal the
anchor holes in any way. In the event that water should collect, it
must be allowed to drain out of the cabinet through the anchor
holes.