User's Manual
Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
2- 61
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
................................................................................................................................
............................................
4 Tighten the anchor bolts or nuts on both cabinets as follows:
• On mounting bases: torque to 50 ft-lb (68 Nm)
• Seismic zones 0, 1, and 2: Torque the bolts to 18 ft-lb (24 Nm)
• Seismic zones 3 and 4: Torque the nuts to 58 ft-lb (79 Nm).
Refer to the table on Page 2 - 29
BOTTOM FRONT VIEW
2-inch
PLASTIC BUSHING
SEALING WASHER*
AREA BETWEEN
CABINETS
LOCK NUT
2-inch
FEED-THROUGH COUPLING
2-inch
P
LASTIC BUSHING
SEALING WASHER*
LOCK NUT
MODULAR CELL
DUAL BAND CABINET
(WITHOUT INTEGRATED
POWER)
PREVIOUS CABINET
*(”BOX SIDE” FACING
CABINET WALL)










