User's Manual

2-62
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
Attach the 4.0B dual band
Modular Cell cabinet to the
previous Modular Cell
cabinet at the RF cable
guide
WARNING
Equipment damage
When performing the next step, the correct method to align
the 4.0B dual band cabinet to the previous cabinet is to relevel
the 4.0B dual band cabinet.
Perform the following steps to attach the 4.0B dual band cabinet to the
previous cabinet at the RF cable guide.
Important! Before performing the next step, the end panel must
have been removed from the antenna cable cover of the previous
cabinet.
.....
......................................................................................................................................
1 Attach the 4.0B dual band cabinet to the previous cabinet at the RF cable
guide using one of the following procedures, whichever is applicable:
For 1.0, 2.0, or 3.0 previous cabinets only: Using the eight sets
of hex head cap screws, plain washers, lock washers and nuts
supplied with the previously mounted RF cable, attach the 4.0B
dual band cabinet with the screws
on the inside of the 4.0B dual
band cabinet being installed and the nuts on the inside of the
previous cabinet
It is preferred that the screws be installed from inside of the
4.0B dual band cabinet so that all of the nuts are inside of the
previous cabinet when they are tightened in Step 2 .