User's Manual
2-70
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
.............................................................................................................................................................................................................................................................
Installation of the solar shields
Overview
This section presents an overview of solar shield configurations, as
they relate to temperature range, integrated power in the cabinet and
related heat exchanger applications. Also provided are top solar shield
installation procedures (mandatory) and references to left and right
solar shield installation procedures (optional, depending upon
temperature range and cabinet configuration).
The following information, procedures, and procedure references are
included.
Install the top solar shield
Perform the following steps to install the top solar shield on Modular
Cell 4.0B cabinets. Refer to TOP SOLAR SHIELD PARTS on Page 2 - 73,
and TOP SOLAR SHIELD ASSEMBLY on Page 2 - 74, when performing
the steps.
................................................................................................................................
............................................
1 Refer to the figure below for the top solar shield mounting hole locations
on a Modular Cell 4.0B cabinet.
Remove the lifting eye bolts 2 - 69
Install the top solar shield 2 - 70
Install the right side solar shield on the primary cabinet
(reference, if applicable)
2 - 75










