User's Manual
2-72
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
................................................................................................................................
............................................
5 Carefully lift up each corner of the solar shield assembly and insert a
washer (Item 4) between the bottom surface of the solar shield assembly
and the top of the four stand-offs. Refer to the figure on Page 2-74.
................................................................................................................................
............................................
6 Assemble a bolt (Item 5) and washer (Item 4), and insert the bolt through
both solar shields and thread into one of the stand-offs. Repeat the
previous step for the three remaining slot locations. Do not tighten.
Important! When performing the next step, note that the front
to back orientation of the solar shield assembly allows it to be slid
forward to gain access to the cable cover assembly, which is
located at the top-rear of the cabinet.
................................................................................................................................
............................................
7 Slide the solar shield fully to the front of the cabinet, to allow access to
the inside of the antenna cable cover during the installation.
................................................................................................................................
............................................
8 Slide the solar shield towards the rear and position it exactly over the
cabinet. Tighten the bolts to 30 inch-lb (3.4 Nm). Do not overtighten.
Important!If it is necessary to move a Modular Cell 4.0B cabinet
in the future, the top solar shield must be removed and lifting eye
E
ND OF STEPS
.....
.........................................................................................................
..................................................................
bolts reinstalled.










