User's Manual

2-74
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
TOP SOLAR SHIELD ASSEMBLY
ITEM 1,
SHIELD,
SOLAR
(TOP)
ITEM 3,
SPACER
ITEM 4,
WAS HE RS
ITEM 2, ASSEMBLY,
SOLAR SHIELD (BOTTOM)
ITEM 5, BOLT (TORQUE TO
26 INCH_LBS (3.0 Nm)*
FRONT
FINAL POSITION:
MOVE SOLAR
SHIELD FULLY TO
REAR
SOLAR SHIELD
PART OF CABINET
FRONT HEAT
EXCHANGER
LOCATION, IF
EQUIPPED
* DO NOT TIGHTEN THE BOLTS UNTIL AFTER THE INSTALLATION IS COMPLETED
(CHAPTER 7). THIS IS TO ALLOW THE SOLAR SHIELD TO BE SLID FORWARD TO
ALLOW ACCESS TO THE INSIDE OF THE ANTENNA CABLE COVER DURING THE
INSTALLATION.
ANTENNA CABLE
COVER AND TOP
PANEL
FRONT HEAT EXCHANGER
LOCATION, IF EQUIPPED
SPACER, SCREW, NUT, AND
WASHERS (1 SET OF 5 - PRE -
ASSEMBLED WITH TOP AND
BOTTOM SOLAR SHIELD)