User's Manual

Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
2- 75
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
Install the right side solar
shield on the primary
cabinet (reference, if
applicable)
Important! When installing a battery cabinet at the same time
as a Modular Cell 4.0B primary cabinet, do not install the right
side solar shield, if it is received. It will not be used.
If applicable, the left solar shield is shipped installed, to be moved to a
dual band cabinet when it is subsequently installed. The right solar
shield is shipped as a kit, if applicable, and therefore must be installed
in the field. Instructions are included in the kit. The right solar shield
must be removed when a battery cabinet is installed. It will not be
reused.
................................................................................................................................
............................................
1 Install the right side solar shield according to the instructions provided
in the kit. Refer to the figure below for the completed installation
................................................................................................................................
............................................
2 Check that the right side solar shield is properly secured.
MODULAR CELL 4.0B PRIMARY CABINET
(TOP SOLAR SHIELD NOT SHOWN)
RIGHT SIDE
LEFT SIDE
REAR
FRONT
TOP VIEW