User's Manual
3-2
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Cable connections in the Modular Cell 4.0B cabinets
.............................................................................................................................................................................................................................................................
Cable connection references
Cable connections covered
in this chapter
The following wiring interfaces to the Modular Cell primary cabinet
are covered in this chapter.
• GPS antenna jumper cable
• T1/E1 cable(s)
• External user alarm cable
• All first WNG battery cabinet wiring
The following wiring interfaces to the Modular Cell 4.0B dual band
cabinet are covered in this chapter.
• T1/E1 cable(s)
• Note that EZBFo battery frame installation and wiring is
performed in Appendix A.
Cable connections not
covered in this chapter
Procedures for RF antenna connections:
The procedures for RF antenna connections to primary and dual band
cabinets are not covered in this chapter, since they are not connected
until after certain tests are completed. Refer to Chapter 7, "Finishing
the installation" in this manual for RF antenna connections.
Procedures for power alarm connections to cabinets without
integrated power:
Refer to Appendix B. for all customer supplied power connections.










