User's Manual

2-54
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
Prepare the 4.0B dual band
cabinet for connection to
the previous Modular Cell
cabinet
Important! The following steps must be performed before
moving the 4.0B dual band cabinet into position against the
previous Modular Cell cabinet.
Perform the following steps to prepare the 4.0B dual band cabinet for
attachment to the previous Modular Cell cabinet.
................................................................................................................................
............................................
1 Using a #8 drilled spanner driver, remove the left rear panel from the
antenna cable cover of the 4.0B dual band cabinet. Refer to the figure on
Page 2-55.
................................................................................................................................
............................................
2 Remove the square side panel from the right side of the 4.0B dual band
cabinet. Refer to the figure on Page 2-55.
................................................................................................................................
............................................
3 Attach the DC cable support to the 4.0B dual band cabinet antenna cable
cover using the two self-tapping screws supplied with the kit. Refer to
the figure below.
SELF
TAPPING SCREWS
(2 of 2)
TOP AND BOTTO
M
(USED WITH
PLASTIC
ASSEMBLIES
ONLY)
*
*
GROMMET
USED ON
METAL CABLE
COVERS ONLY