Route the T1/E1 cable(s) to
the Modular Cell 4.0B dual
band cabinet (in line-ups
that utilize existing
PowerHouse24 or
customer supplied power)
Important! If installing the Modular Cell 4.0B dual band
cabinet in a line-up that utilizes an existing WNG power cabinet,
skip to Route the T1/E1 cable(s) to the Modular Cell 4.0B dual band
cabinet (in installations that utilize an existing WNG power cabinet) on
Page 3 - 24 and continue the installation from that point.
Perform the following steps to route the T1/E1 cable(s) to a 4.0B dual
band cabinet in a line-up that has an existing PowerHouse power
cabinet or customer supplied power.
Important! If a 4.0B dual band cabinet is installed in a line-up
with existing 1.0, 2.0, 3.0, or 4.0 cabinets that utilize a
PowerHouse24 cabinet, the total load for all cabinets is limited to
17Kw. The total number of carriers possible in the 4.0B dual band
cabinet may be limited. Use of a dual band cabinet with Integrated
Power is recommended to overcome this limitation
................................................................................................................................
............................................
1 Using a #8 drilled spanner driver, remove the rear panels from the
antenna cable covers of the Modular Cell cabinets, as required. Refer to
the figure on Page 3-21.
................................................................................................................................
............................................
2 If necessary, use a #14 drilled spanner driver to remove the top panels
from the antenna cable cover of the applicable cabinets. Refer to the
figure on Page 3-21
................................................................................................................................
............................................
3 Locate the entry point for the T1/E1 cable(s) into the Modular Cell
primary cabinet.
Important! For 1.0/2.0 primary cabinets, the T1/E1 cable(s) are
typically routed through the conduit at the bottom of the cable
duct assembly. Refer to the figure on Page 3-21. Before
proceeding, note the following:
• In the case of customer supplied power, the T1/E1 cable(s)
should not be routed through the cable duct if AC cables are
also present.
• If the primary cabinet is a 3.0, 4.0, or 4.0B, skip to Step 9