User's Manual

3-20
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Cable connections in the Modular Cell 4.0B cabinets
................................................................................................................................
............................................
4 Remove the rear cover from the cable duct assembly. Refer to the figure
below and the figure on Page 3 - 21.
................................................................................................................................
............................................
5 Locate the T1/E1 cable(s) for the Modular Cell 4.0B dual band cabinet.
(coiled up inside the cable duct assembly as part of site preparation).
Refer to the figure on Page 3-21 for the cable duct location.
PRIMARY CABINET
G-1 POSITION
G-2 POSITION
G-3 POSITION
REAR VIEW
REMOVE THESE REAR
PANELS, AS REQUIRED
REMOVE TOP
PANELS, AS
REQUIRED
T1/E1 ENTRY
FOR 1.0/2.0
CABINETS
CABLE DUCT
ASSEMBLY
CABLE DUCT
COVER
T1/E1 ENTRY
FOR
3.0/4.0/4.0B
CABINETS