User's Manual

Cable connections in the Modular Cell 4.0B cabinets
3- 21
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
................................................................................................................................
............................................
6 Remove the cable(s) from the cable duct and fully unroll.
................................................................................................................................
............................................
7 Route the T1/E1 cable(s) through the cable duct assembly to the top of
the Modular Cell primary cabinet, between the correct set of cable
brackets, depending upon the position of the cabinet being installed (G-
1, G-2 or G-3). Refer to the figure on Page 3-22
A
A
CABLE DUCT
ASSEMBLY
CABLE DUCT
REAR PANEL
CABLE DUCT
ASSEMBLY
METAL
CONDUIT
FLEXIBLE
CONDUIT
PowerHouse
24 Cabinet
TOP VIEW
USER ALARMS
VIEW A - A
Modular Cell
Primary 1.0/
2.0
Cabinet
PowerHouse 24
Cabinet
T1/E1 CABLE
FOR MODULAR
CELL 4.0 B DUAL
BAND CABINET