User's Manual

Cable connections in the Modular Cell 4.0B cabinets
3- 23
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
Important! Skip to Routing of T1/E1 and user alarm cables into a
Modular Cell 4.0B cabinet on Page 3 - 27 and continue the
installation from that point.
PRIMARY CABINET
G-1 POSITION
G-2 POSITION
G-3 POSITION
REAR VIEW
NOT ALL OF THE LINE-UPS BELOW ARE EXISTING
CONFIGURATIONS
PRIMARY G-1 G-2 G-3
4.0B 4.0B
4.0 4.0 4.0B
3.0 4.0 4.0B
3.0 3.0 4.0 4.0B
1.0/2.0 4.0 4.0B*
1.0/2.0 1.0/2.0/3.0 4.0 4.0B*
* With a PowerHouse24 cabinet, the total load for all cabinets is limited to
17Kw. The total number of carriers possible in the 4.0B dual band cabinet
may be limited.
T1/E1 ENTRY
FOR 1.0/2.0
CABINETS
CABLE DUCT
ASSEMBLY
CABLE DUCT
COVER
T1/E1 ENTRY
FOR
3.0/4.0/4.0B
CABINETS