User's Manual

3-26
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Cable connections in the Modular Cell 4.0B cabinets
................................................................................................................................
............................................
8 Continue to route the T1/E1 cable(s) through antenna cable covers until
the position of the 4.0B dual band cabinet is reached. Refer to the figure
below.
................................................................................................................................
............................................
9 Locate the T1/E1 cable entry point(s) at the top of the Modular Cell 4.0B
dual band cabinet. Refer to the figure on Page 3-29.
Important! Skip to Routing of T1/E1 and user alarm cables into a
Modular Cell 4.0B cabinet on Page 3 - 27 and continue the
installation from that point.
WNG POWER
CABINET
MODULAR CELL
1.0/2.0 PRIMARY
CABINET
POWER CABINET PRIMARY CABINET G-1 POSITION
G-2 POSITION
G-3 POSITION
NOT ALL OF THE LINE-UPS BELOW ARE EXISTING CONFIGURATIONS
PRIMARY G-1 G-2 G-3
1.0/2.0 4.0 4.0B*
1.0/2.0 1.0/2.0/3.0 4.0 4.0B*
* With a WNG power cabinet, the total load for all cabinets is limited to 17Kw. The total
number of carriers possible in the 4.0B dual band cabinet may be limited.
USE THIS ENTRY FOR 3.0/4.0/
4.0B PRIMARY CABINETS