User's Manual

2-56
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
Position the 4.0B dual band
Modular Cell cabinet
WARNING
Personnel injury or equipment damage
Cabinets are too heavy to move without appropriate lifting
devices. When moving the cabinet, use appropriate lifting
devices and a sufficient number of personnel.
Perform the following steps to position the 4.0B dual band cabinet and
install the anchor bolts.
Important! When performing the next step, align the AC feed-
through conduit with the port opening in the wall of the 4.0B dual
band cabinet.
................................................................................................................................
............................................
1 If installing directly to a concrete surface, remove tape and any debris
covering the anchor holes.
................................................................................................................................
............................................
2 Place the cabinet into position.
On mounting bases, or
On concrete, over the anchor holes or the set anchors.
................................................................................................................................
............................................
3 Open the front door of the cabinet to view the front mounting holes.
Note that the key must remain in the latch to open the door.
................................................................................................................................
............................................
4 Position the 4.0B dual band cabinet against the RF cable guide on the
previous Modular Cell cabinet.
Important! If installing on mounting bases, you must
immediately install the bolts that secure the cabinet to the base.
Leave these bolts loose. They will be tightened later.