Component installation in the Modular Cell 4.0B and the
WNG24-BC battery cabinets
Route the thermal probe
cable from the 4.0B primary
cabinet and mount the
thermal probe in the
battery cabinet
Important! If currently installing a second battery cabinet with
a 4.0B primary cabinet, skip to Step 2 for routing and positioning
of thermal probe cable and thermal probe.
Perform the following steps to route the thermal probe cable and mount
the thermal probe in the battery cabinet. A plastic mounting bracket
with double sided tape and a wire tie is supplied with each thermal
probe.
.....
......................................................................................................................................
1 For installations with a 4.0B primary cabinet, route the thermal probe
cable and mount the thermal probe on the battery retaining bracket as
listed in the following instructions.
If the cabinet is fully populated with 10 strings (20 batteries):
Route the thermal probe cable to the top shelf battery
retaining bracket and mount the thermal probe on the center
of the bracket. Refer to the figure on Page 5-82, item 1.
If the cabinet is not fully populated with batteries:
Route the thermal probe cable to the top populated shelf
battery retaining bracket and mount the thermal probe on the
center of the bracket. Refer to the figure on Page 5-82, item
2.
................................................................................................................................
............................................
2 If installing a second battery cabinet, refer to the figure and instructions
on Page 5 - 82.
................................................................................................................................
............................................
3 Remove the thermal probe from the retaining bracket in the first battery
cabinet and unplug it from the thermal probe cable. Refer to the figure
below, item 3.
................................................................................................................................
............................................
4 Relocate the removed thermal probe on the shelf 5 battery retaining
bracket (or highest populated shelf location) in the second battery
cabinet. Refer to the figure below, item 4 or 5.
................................................................................................................................
............................................
5 Locate the thermal probe cable supplied with the second battery cabinet.
Refer to the figure below, item 6. Plug this cable into the cable from the