User's Manual

Component installation in the Modular Cell 4.0B and the
WNG24-BC battery cabinets
5- 83
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
primary cabinet (item 7), route it to the second battery cabinet, and
connect it to the thermal probe (item 8).
................................................................................................................................
............................................
6 To complete the installation of the first or second WNG24-BC battery
cabinet, skip to "How to make final DC connections after installation of
a battery cabinet", on page 5-84.
BATTERY-
SHELF 5
INSTALL THE
THERMAL PROBE
ON SHELF 5, OR
THE TOP
POPULATED
SHELF IN THE
FIRST
BATTERY
CABINET
WHEN INSTALLING A SECOND BATTERY CABINET, REMOVE AND UNPLUG THE THERMAL PROBE
FROM THE CABLE IN THE FIRST
BATTERY CABINET (ITEM 3). THEN RELOCATE THE THERMAL
PROBE ON SHELF 5 OR
THE TOP POPULATED SHELF IN THE SECOND BATTERY CABINET (ITEMS 4
OR 5). THEN LOCATE THE THERMAL PROBE CABLE SUPPLIED WITH THE SECOND BATTERY
CABINET (ITEM 6). PLUG THIS CABLE INTO THE CABLE FROM THE PRIMARY CABINET (ITEM 7),
ROUTE THE CABLE TO THE SECOND BATTERY CABINET, AND CONNECT IT TO THE THERMAL
PROBE (ITEM 8).
BATTERY-
SHELF 4
BATTERY-
SHELF 3
FIRST BATTERY
CABINET
SECOND BATTERY
CABINET
1
2
3
4
8
6
5
7