User's Manual

5-88
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Component installation in the Modular Cell 4.0B and the
WNG24-BC battery cabinets
................................................................................................................................
............................................
3 Repeat Steps 5 and 6 for the four 24-VDC return cables. Refer to the
figure below.
................................................................................................................................
............................................
4 Torque all DC cable connections. Refer to the electrical torque
E ND OF STEPS
................................................................................................................................
.............................................
specifications provided in Chapter 1.
Connect the battery cables
in the first and/or second
WNG24-BC battery
cabinets
Important! Refer to the figures on Page 5 - 91 for the battery
wiring diagram and battery cabling plan for C-11 batteries. Refer
to the figures on Page 5 - 92 for the battery wiring diagram and
battery cabling plan for L1, L2, and 12IR125 batteries. Use these
figures when measuring voltages, determining polarities and
rewiring battery cables, if required.
Perform the following steps to connect the battery cables on the battery
retaining brackets in the first and/or second battery cabinet, as
applicable. If installing the second battery cabinet only, skip to Step 4.