User's Manual

RF cable connections between existing Modular Cell
cabinets and a 4.0B dual band cabinet
6- 5
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
Determine the prerequisite
changes needed in the
existing cabinet(s) in your
line-up configuration
Before connecting cables between the 4.0B dual band cabinet being
installed and the existing cabinet(s), changes may be required in the
existing cabinet(s). Use the following tables to determine the
prerequisite changes required for the existing cabinet(s), depending
upon your line-up configuration. These changes must be performed
prior to the connection of cabling between the 4.0B dual band cabinet
being added and the existing cabinet(s). Instructions for the installation
of the prerequisite parts are included in the individual parts shipment.
Important! After making the required changes, proceed to Routing and
connection of RF inter-frame cables to a 4.0B Modular Cell dual band cabinet,
on Page 6 - 8 for the procedures to use to route and connect the cables.
Important! Not all of the line-ups listed in the table that follows
are existing configurations