User's Manual

6-10
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
RF cable connections between existing Modular Cell
cabinets and a 4.0B dual band cabinet
................................................................................................................................
............................................
4 In the Modular Cell 4.0B dual band cabinet being installed, route the 15-
MHz cable(s) up the inside right side, and through the RF cable gasket
between the cabinets. Route the cable(s) to the applicable cabinet as
follows:
For line-up 1, route the two cables into the primary cabinet
For line-up 2, route the two cables into the G-1 cabinet
For line-ups 3 and 4, route the single cable through the G-1
cabinet and into the primary cabinet
For line-ups 5 and 6, route the single cable into the G-2 cabinet
Important! For line-up 4 (three cabinet line-up with 3.0
primary cabinet), continue to the next step. For all other line-ups
skip to Step 10 on Page 6 - 11.
................................................................................................................................
............................................
5 Line-up 4, Figure on page 6-14: In the 3.0 primary cabinet, if the air
baffle is not mounted on the door, remove the air baffle from above the
radio shelves. Refer to the figure below.
Important! When performing the next step note that the cables
at the Smart Switch connectors J3, J4, and J9 can become
disconnected if care is not taken when sliding out the shelf.
RADIO SHELF
BAFFLE
RECTIFIER
BAFFLE
MOUNTING BOLT
LOCATION
MOUNTING
BOLT
3.0 MODULAR CELL PRIMARY CABINET