User's Manual

RF cable connections between existing Modular Cell
cabinets and a 4.0B dual band cabinet
6- 17
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
15 MHZ INTER-FRAME CABLE: LINE-UP 6
LINE-UP
PRIMARY CABINET CONNECTION
PROCEED TO:
T
he existing 15 MHz cable connection at
the J5 port of the Smart Switch in the
primary cabinet in the 3.0 primary cabinet
remains the same. A kit is supplied to
install a 15MHz splitter in the
G-2
cabinet.
I
nstallation instructions are supplied with
the kit. 15MHz connections from all three
c
abinets are made to this splitter as shown
in the illustration below.
"Route and connect
the GPS cable".
Line-up 6
4.0B Dual Band with 4.0 G-2, 3.0
G-1, and 3.0 Primary
G-2
G-1
PRI
G-3
4.0B DUAL BAND
G-3 CABINET
3.0 PRIMARY CABINET
4.0 G-2 CABINET
TOP VIEW
G-1
G-2
SMART SWITCH