User's Manual

1-50
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Overview of the Flexent‚ Modular Cell 4.0B cabinet
installation
Storage prior to installation: 20 degrees C (68 degrees F)
If installation has to proceed at -25 deg. C or below, cables
must be stored in heated areas (Min. 20 deg. C) for 24 hours
prior to installation. Extra care should be taken to keep cables
sheltered from winds and temperature below -25 deg. C
during installation. The use of a heated tent is highly
recommended.
If installations have to occur at temperatures below -25 deg.
C and shelter cannot be provided, the following cable along
with the associated hardware is recommended.
Industrial Wire & Cable Corp. Type MTW Machine Tool
Wire, MTWxxxx *
FCI Terminal Lug (or equivalent), 3/8" Bolt Size, Straight, 2-
Hole, 1" Center to Center *
FCI Terminal Lug (or equivalent), ¼" Bolt Size, Straight, 2-
Hole, 5/8" Center to Center *
FCI Terminal Lug (or equivalent), 5/16 Bolt Size", Straight,
One-Hole *
Panduit (or equivalent) Type HSTTV 75-T2 Insulating
Sleeve, Heat Shrink, Red *
Panduit (or equivalent) Type HSTTV 75-T Insulating Sleeve,
Heat Shrink, Black *
* Depends on wire gauge being used.