User's Manual

2-2
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
Installation of anchors and optional
mounting bases, if applicable
.............................................................................................................................................................................................................................................................
Overview
Purpose
This section provides the information required for the installation of
anchors and optional steel mounting bases, if applicable.
Anchor holes should be drilled for all cabinets to be installed, including
primary, dual band, and battery cabinets. Note that anchors for
mounting bases must be "set" in the drilled anchor holes, prior to
placement of the mounting base.
Contents
This section covers the following procedures.
How to determine the anchoring requirements 2 - 3
Anchor installation
2 - 5
Installation of optional steel mounting bases for
a 4.0B primary cabinet with
integrated power, and battery cabinets if applicable
2 - 11
Installation of optional steel mounting bases for a 4.0B dual band
cabinets 2 - 16