User's Manual

Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
2- 11
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
Installation of optional steel mounting bases for a 4.0B primary
.............................................................................................................................................................................................................................................................
cabinet with integrated power, and battery cabinets if applicable
Overview
Important: If installing a dual band cabinet on a mounting base, skip to
Installation of optional steel mounting bases for a 4.0B dual band cabinets on
Page 2 - 16 to continue the installation.
This section provides procedures for the installation of optional steel
mounting bases, for primary and battery cabinets, at various seismic
zone sites.
This section covers the following procedures.
Install the optional bases
for the primary cabinet, and
battery cabinets if
applicable, using zone 0, 1,
and 2 type anchors
Important! If using zone 3 or 4 anchors, skip to Install the
optional mounting bases for the primary cabinet, and battery cabinets if
applicable, using zone 3 and 4 type anchors on Page 2 - 13 and
continue the installation from that point.
Important! If installing a mounting base for the first battery
cabinet only, perform only the Step 4 instructions. If installing a
mounting base for the second battery cabinet only, perform only
the Step 5 and Step 6 instructions.
Perform the following steps to install mounting bases using zone 0, 1,
and 2 type anchors.
................................................................................................................................
............................................
1 Align the Modular Cell 4.0B cabinet mounting base mounting holes
with the anchor holes.
................................................................................................................................
............................................
2 Place the two washers onto each anchor bolt, and insert the anchoring
bolts through the mounting base holes and into the anchors. Refer to the
figure on Page 2-12. Level the mounting base (as required) using shims.
Install the optional bases for the primary cabinet, and
battery cabinets if applicable, using zone 0, 1, and 2
type anchors
2 - 11
Install the optional mounting bases for the primary
cabinet, and battery cabinets if applicable, using zone 3
and 4 type anchors
2 - 13