User's Manual
2-14
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
................................................................................................................................
............................................
4 Hand-tighten the nuts, but leave them loose (they will be tightened
later).
Important! If not installing the first battery cabinet mounting
base at this time, tighten all four nuts to 58 ft-lb (79 Nm). Refer to
the figure on Page 2-15. Then skip to Cabinet handling on Page 2 -
21 to continue the installation.
................................................................................................................................
............................................
5 Repeat Steps 1 through 4 for the first battery cabinet mounting base and
then attach it to the Modular Cell 4.0B mounting base using the four
bolts, flat washers and lock washers supplied. Refer to the figure on
Page 2-14.
Important! If not installing the second battery cabinet
mounting base at this time, tighten all eight nuts to 58 ft-lb (79
Nm). Refer to the figure on Page 2-15. Then skip to Cabinet
handling on Page 2 - 21 to continue the installation.
FLAT
WASHER
FLAT
WA SH ER
NUT
BOLT
THREADED
ROD
LOCK
WA SH ER
SHIM
(EXAMPLE)
PLATE
WA SH ER
PRIMARY CABINET MOUNTING BASE
OR
FIRST WNG BATTERY CABINET MOUNTING BASE
FIRST WNG BATTERY CABINET MOUNTING BASE
OR
SECOND WNG BATTERY CABINET MOUNTING BASE