User's Manual
Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
2- 19
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
Install the optional
mounting bases for a dual
band cabinet using zone 3
and 4 type anchors
Important! If not using zone 3 or 4 anchors, skip to Cabinet
handling on Page 2 - 21 and continue the installation from that
point.
Perform the following steps to install the dual band cabinet mounting
base using zone 3 and 4 type anchors.
................................................................................................................................
............................................
1 Align the dual band cabinet mounting base mounting holes with the
anchor holes.
................................................................................................................................
............................................
2 Insert the threaded rod assemblies (shown below) through the holes in
the mounting base and into the anchors. Refer to the figure on Page 2-20.
................................................................................................................................
............................................
3 Level the mounting base (as required) using shims.
................................................................................................................................
............................................
4 Hand-tighten the nuts, but leave them loose (they will be tightened
later).
THREADED
ROD
PLATE
WA SH ER
FLAT
WASHER
NUT