User's Manual
Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
2- 23
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
Supplies needed
The following supplies are required.
• Head gear
• Insulated gloves
Safety precautions for handling equipment
• Only those operators who are specifically trained and meet
company requirements will be permitted to operate the derrick or
forklift equipment.
• All persons working with derrick trucks or forklifts, must wear
standard safety headgear, eye protection, and insulated gloves (if
required).
• Do not operate a derrick until both stabilizers are extended and
firmly supported. Stabilizers should not be extended after a load is
suspended from the derrick.
• While raising the derrick from the stowed position, be alert for
overhead obstructions, such as power lines, that may interfere.
• At all times, keep bystanders away from the work area.
• Operators must not suspend loads over people, nor can any person
be permitted to work, stand, or pass under a suspended load.
• Personnel must stay clear of the concrete pad when tower work is
performed.