User's Manual

2-28
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
Cabinet placement, anchoring and
grounding
.............................................................................................................................................................................................................................................................
Overview
Purpose
Important! Instructions for placement, anchoring, and grounding of
the EZBFo battery base modules are provided in Appendix A.
This section provides the following placement, anchoring, grounding,
and associated instructions.
Flexent Modular Cell 4.0B primary, as well as physical connection
of a 4.0B dual band cabinet to a Modular Cell 1.0/2.0/3.0/4.0 first
or second growth cabinet, as applicable
WNG24-BC battery cabinet, both first and second, and physical
connection to a 4.0B integrated power primary cabinet, or first
battery cabinet, as applicable
Heat exchanger and solar shield applications, solar shield
installation, as applicable, and door adjustment.
Contents
Use the following procedures, as applicable.
Anchor and torque requirements 2 - 29
Placement and anchoring of the Flexent
Modular Cell 4.0B primary cabinet 2 - 30
Placement and anchoring of the WNG24-BC battery cabinets
2 - 34
Placement and anchoring of a Flexent Modular Cell 4.0B dual band cabinet 2 - 50
Install the cabinet grounding cables
2 - 65
Remove the lifting eye bolts
2 - 67
Install the top solar shield
2 - 70
Install the right side solar shield on the primary cabinet (reference, if applicable)
2 - 75
Adjust the door roller bearing (if required) 2 - 76