User's Manual
2-34
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
.............................................................................................................................................................................................................................................................
Placement and anchoring of the WNG24-BC battery cabinets
Overview
This procedure module provides the following instructions.
For the purpose of these instructions, the WNG24-BC battery cabinet
will be hereafter referred to as the first or second battery cabinet, or the
existing cabinet wen required.
• Placement, anchoring and grounding the WNG24-BC battery
cabinet, both first and second.
• Physical connection of a WNG24-BC battery cabinet to the
primary Modular Cell 4.0B or a second WNG24-BC battery
cabinet to the first battery cabinet (since the instructions are the
same, references will be to attaching a battery cabinet to the
existing cabinet)
This module contains the following procedures.
Prepare the existing cabinet for attachment of an additional
cabinet
2 - 35
Prepare the cabinet being installed for attachment to the
existing cabinet
2 - 37
Partially install the AC cable guide in the cabinet being installed 2 - 39
Move/lift the cabinet being installed into position 2 - 40
Attach the cabinets together at the square cable support (with
second battery cabinet only)
2 - 42
Install anchoring bolts or anchor assemblies and level the
battery cabinet(s)
2 - 45
Complete the installation of the AC feed-through coupling and
tighten the anchor bolts or nuts
2 - 48