User's Manual
2-38
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
...........................................................................................................................................................................................................................................................
Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
................................................................................................................................
............................................
4 Place the DC cable support against the side of the cabinet being
installed, and temporarily attach the DC cable support with the two
supplied self-tapping screws, as shown in the figure below.
................................................................................................................................
............................................
5 Close the cabinet front door.
Important! When performing the step, the nut on the top of the
cabinet must be held in place while the lifting eye bolt is
tightened. Otherwise, the nut can become loose and result in water
leakage into the cabinet. Do not overtighten.
................................................................................................................................
............................................
6 Install the four lifting eye bolts if required for handling and placing the
cabinet.
S
ELF TAPPING
SCREWS (2 of
2)
OR