Modular Cell 4.0B and WNG24-BC cabinet handling,
placement, anchoring and grounding
2- 41
Lucent Technologies – Proprietary
See notice on first page
401-703-454
FOA Draft Issue 1
January, 2006
............................................................................................................................................................................................................................................................
................................................................................................................................
............................................
5 Perform a preliminary leveling of the cabinet being installed, using the
supplied shims.
................................................................................................................................
............................................
6 Temporarily thread a locknut onto the AC feed-through coupling inside
of the existing cabinet. This is to hold the feed-through coupling in place
until it is permanently attached. Refer to the figure below.
................................................................................................................................
............................................
7 Perform another leveling of the cabinet being installed using shims.
Note that the holes in the cable supports must align with the holes in the
opposite cabinet.
................................................................................................................................
............................................
8 If installing a second battery cabinet, continue the installation on the
next page. If installing the first battery cabinet, skip to
Install anchoring
bolts or anchor assemblies and level the battery cabinet(s) on Page 2 - 45 for
the procedure to anchor the battery cabinet.
EXISTING
CABINET*
WNG
BATTERY
CABINET
SURFACE OR
MOUNTING
BASE
AC FEED-THROUGH
COUPLING
SQUARE RF CABLE
GUIDE
TEMPORARY
LOCKNUT
HOLES IN CABLE GUIDE AND
THE EXISTING CABINET MUST
ALIGN, AND THE CABLE GUIDE
MUST BE HELD FIRMLY IN
PLACE BETWEEN THE TWO
CABINET WALLS
REAR VIEW
* EXISTING CABINET IS THE PRIMARY CABINET
OR FIRST BATTERY CABINET